Vindmøller - fossilbrændstof forbrug | The Energy Collective

On average 1 MW of wind capacity requires 103 tonnes of stainless steel, 402 tonnes of concrete, 6

Ikke angivet Ikke angivet,

13/04/2015

On average 1 MW of wind capacity requires 103 tonnes of stainless steel, 402 tonnes of concrete, 6.8 tonnes of fiberglass, 3 tonnes of copper and 20 tonnes of cast iron.

Hermed yderligere et link om EROIs for forskellige produktions typer.